Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-90
I-90 in both directions: Narrow lanes, width limit in effect.

Between Westbound Huetter Rest Area and Exit 17: Mullan Road (near Coeur d'Alene). Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until July 10, 2018 at about 5:00AM PDT.

Web Comment: Both directions on I90 will be narrowed down to two 11' lanes with a 2' shoulder starting on April 7th. Wide loads should be advised.

Last updated on April 20
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.

Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until October 16, 2018 at about 11:45PM PDT.

Web Comment: All traffic is crossed over to the EB Structure, with only one lane, each direction. Pay attention to signs. There is a 14 ft width restriction until October 16, 2018

Last updated on May 11
I-90: Bridge construction, work on the shoulder, alternating lane closures, entrance ramp closed.

Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. The entrance ramp is closed. Speed limit 45 MPH. Width limit 18'0". Until December 6, 2018 at about 6:00PM PDT.

Web Comment: Coeur D’Alene River Road is restricted to one lane alternating traffic at bridge. Look out for traffic signals and flaggers at intersections. Reconstruction of westbound on-ramp currently underway. Ramp is open, but not paved. Gravel surface present. Use caution. Reconstruction of eastbound off-ramp will begin May 14. Expect full Ramp closure, 24 hours a day until June 4, 2018. Use alternate route. Look for detour signage. Bridge deck installation will being May 14, 2018. Look for travel lane shifts on I-90. Look for signs.

Last updated on May 17
I-90 in both directions: Major road construction, roadway reduced to one lane, temporary lane markings, width limit in effect, speed restrictions in force.

Between Exit 67: Mill Street and Lookout Pass (near Mullan). Major road construction work is in progress. The roadway is reduced to one lane. There are temporary lane markings. There is a width limit in effect. Speed restrictions are in force. Speed limit 45 MPH. Width limit 12'0".

Last updated on May 18
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Westbound Huetter Rest Area and Exit 17: Mullan Road (near Coeur d'Alene). Look out for construction work. Advisory speed limit 55 MPH. From 7:00AM PDT to 5:00AM PDT on weekdays and Saturday. Until October 12, 2018 at about 11:59PM PDT. Between Westbound Huetter Rest Area and Exit 17: Mullan Road (near Coeur d'Alene). Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until July 10, 2018 at about 5:00AM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until October 16, 2018 at about 11:45PM PDT. Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. The entrance ramp is closed. Speed limit 45 MPH. Width limit 18'0". Until December 6, 2018 at about 6:00PM PDT. Between Exit 67: Mill Street and Lookout Pass (near Mullan). Major road construction work is in progress. The roadway is reduced to one lane. There are temporary lane markings. There is a width limit in effect. Speed restrictions are in force. Speed limit 45 MPH. Width limit 12'0".
I-90 in both directions: Narrow lanes, width limit in effect.
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.
I-90: Bridge construction, work on the shoulder, alternating lane closures, entrance ramp closed.
I-90 in both directions: Major road construction, roadway reduced to one lane, temporary lane markings, width limit in effect, speed restrictions in force.
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations