Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-90
I-90 eastbound: Construction work, width limit in effect.

Between Eastbound Huetter Rest Area (near Post Falls) and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for construction work. There is a width limit in effect. Until Saturday, at about 11:59PM PDT.

Web Comment: Eastbound traffic has two lanes which will now allow wide loads. Any load over 13' must travel through between the hours of 10pm to 6am due to construction work.

Last updated on September 19
I-90: Night time construction work, lane closed, work in the median. Truck speed limit 55 MPH. Width limit 14'0".

Between Eastbound Huetter Rest Area and Westbound Huetter Rest Area (near Post Falls). Night time construction work is in progress. A lane is closed. People are working in the median. Truck speed limit 55 MPH. Width limit 14'0". From 7:30PM PDT to 5:30AM PDT on Wednesday and Thursday. Until tomorrow at about 5:30AM PDT.

Web Comment: Width and speed restrictions only apply during working hours.

Last updated on October 16
I-90 westbound: Construction work, narrow lane, width limit in effect. Width limit 11'0".

Between Exit 15: Sherman Avenue (Coeur d'Alene) and Westbound Huetter Rest Area (near Post Falls). Look out for construction work. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until Saturday, at about 11:59PM PDT.

Web Comment: Starting 9/15, westbound traffic will be shifted into the middle two lanes. The entrance ramp and exit ramp for 4th Street (Exit 13) will be closed until 10/19. There will be two, separated 11' lanes. Maximum truck load width of 11'. Over width trucks must use the alternate city route via 15th street exit to Appleway Avenue and the Northwest Boulevard entrance ramp. Wide loads over 13' that use the alternate city route must go through between the hours of 10pm and 6am.

Last updated yesterday at 6:21pm PDT
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".

Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PDT.

Web Comment: Coeur D'Alene River Road will be closed to northbound and southbound traffic off and on until final paving has finished on October 25, 2018 and then will be restricted to one lane alternating traffic when open. Look out for traffic signals and flaggers at the intersections. Expect the Westbound off ramp to be closed and reopened on a gravel surface, motorcycles use caution.

Last updated yesterday at 4:34pm PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Eastbound Huetter Rest Area (near Post Falls) and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for construction work. There is a width limit in effect. Until Saturday, at about 11:59PM PDT. Between Eastbound Huetter Rest Area and Westbound Huetter Rest Area (near Post Falls). Night time construction work is in progress. A lane is closed. People are working in the median. Truck speed limit 55 MPH. Width limit 14'0". From 7:30PM PDT to 5:30AM PDT on Wednesday and Thursday. Until tomorrow at about 5:30AM PDT. Between Exit 15: Sherman Avenue (Coeur d'Alene) and Westbound Huetter Rest Area (near Post Falls). Look out for construction work. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until Saturday, at about 11:59PM PDT. Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PDT.
I-90 eastbound: Construction work, width limit in effect.
I-90: Night time construction work, lane closed, work in the median. Truck speed limit 55 MPH. Width limit 14'0".
I-90 westbound: Construction work, narrow lane, width limit in effect. Width limit 11'0".
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations