Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Future Truck Restrictions on ID 21
ID 21

Between Archie Creek Road (42 miles north of the Idaho City area) and Warm Springs Creek Airport Road (38 miles south of the Stanley area). Road construction. Bridge maintenance operations. Paving operations. Roadway reduced to one lane. Temporary traffic lights. Speed restrictions in force. Width limit in effect. Speed limit 25 MPH. Width limit 11'0". Expect 10 - minute delays. Starting May 29, 2018 at 12:00AM MDT until August 3, 2018 at about 11:59PM MDT.

Web Comment: Silica fume overlay to resurface the S Fork of the Payette River Bridge (MP 91.02) and Five Mile Creek Bridge (MP 82.75). The bridges will be down to one lane with a temporary light controlling traffic.

Last updated on May 22