Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Truck Restrictions—Statewide
Map of Statewide Between Thompson Creek Road (3 miles south of the Clayton area) and US 93 (20 miles north of the Clayton area). Look out for large animals on the roadway. Prepare to stop. Between Exit 150: Hamer Road (2 miles north of the Hamer area) and Exit 167: ID 22 (5 miles south of the Dubois area). Road construction work is in progress. Until August 28, 2020 at about 11:59PM MDT. Between First South Street and 4150 East Road (near Rigby). Major road construction work is in progress. Entire intersection. The roadway is reduced to one lane. Reduce your speed. Width limit 12'0". Speed limit 35 MPH. Expect 15 - minute delays. Until September 30, 2020 at about 11:59PM MDT. Between Exit 29: US 20; Franklin Road (Caldwell) and Exit 33: ID 55 (near Nampa). Road closed to traffic. Detour in operation. From 10:00PM MDT to 7:00AM MDT on Friday and Saturday. Starting Friday at 10:00PM MDT until Sunday, at about 7:00AM MDT. Between Swan Lake Road (5 miles east of the Soda Springs area) and Georgetown Summit (3 miles west of the Georgetown area). Road construction work is in progress. The roadway is reduced to one lane. The road is being repaved. There is a width limit in effect. Speed restrictions are in force. Expect delays. Width limit 16'0". Speed limit 45 MPH. Expect 15 - minute delays. Until October 30, 2020 at about 7:00PM MDT. Between Exit 112: I-84B and Exit 125: 18th East Street (5 miles west of the Glenns Ferry area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until October 30, 2020 at about 11:59PM MDT. Between Old Highway 91 and 2000 South Road; Menan Butte Road (13 to 15 miles west of the Rexburg area). Be aware of the animal crossing area. Drive with extreme caution. Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (1 to 10 miles west of the Mountain Home area). Road construction work is in progress. A seal coat treatment has been applied. The roadway is reduced to one lane. Speed limit 65 MPH. Width limit 16'0". From 12:00AM MDT to 12:00PM MDT on Wednesday, Thursday, Friday and Saturday. Until Sunday, at about 11:00PM MDT.
I-84 westbound: Exit ramp closed, see map for detour(s).
US 30 in both directions: Road construction, roadway reduced to one lane, paving operation, width limit in effect, speed restrictions in force, delay. Width limit 16'0". Speed limit 45 MPH. Expect 15 - minute delays.
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force. Speed limit 70 MPH. Width limit 14'0".
I-84 westbound: Exit ramp closed, entrance ramp closed.
ID 51: Road closed to traffic, because of utility work.
I-90 westbound: Entrance ramp closed, see map for detour(s).
ID 48 in both directions: Major road construction, entire intersection, roadway reduced to one lane, reduce your speed. Width limit 12'0". Speed limit 35 MPH. Expect 15 - minute delays.
I-84 westbound: Entrance ramp closed, due to road construction work.
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
US 95 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
I-84: Road construction, seal coat, roadway reduced to one lane. Speed limit 65 MPH. Width limit 16'0".
ID 6 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
I-84 westbound: Entrance ramp closed, due to road construction work, follow the detour sign, see map for detour(s). Width limit 14'0".
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
I-84 in both directions: Road closed to traffic, detour in operation.
Marsing Weigh Station
US 95: Bonners Ferry
Lewiston Weigh Station
Hollister Weigh Station
ID 55: Horseshoe Bend Hill
Bonners Ferry Weigh Station
I-90: Lookout Pass
Cotterell Weigh Station
ID 3: Kendrick
US 95: Whitebird Hill
Huetter Weigh Station
US 95: Lewiston Hill
Sage Junction Weigh Station
Horseshoe Bend Weigh Station
East Boise Weigh Station
US 30: Fish Creek
Haugan Weigh Station
Inkom Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations