Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions—North Idaho
Map of North Idaho Between Fiddler's Ridge Loop; Travis Road (Potlatch) and O'Rielly Road (near Onaway). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. The roadway is reduced to one lane. Width limit 12'0". Expect 5 - minute delays. Until October 30, 2019 at about 5:30PM PDT. Between ID 58 (2 miles north of the Worley area) and Putnam Road (11 miles south of the Coeur d'Alene area). A lane is closed intermittently. The roadway is reduced to one lane due to bridge construction work. Speed limit 45 MPH. Width limit 14'0". Between US Route 95 Business and Winchester-Culdesac Road (6 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Bridge construction work is in progress. There is work on the shoulder. Reduce your speed. The road is rough. Look out for flaggers. Truck speed limit 35 MPH. Speed limit 35 MPH. Until October 31, 2019 at about 11:59PM PDT. Between Exit 67: Mill Street and Lookout Pass (near Mullan). Be aware of narrow lanes due to long term road construction work. A mandatory speed limit is in force. There are temporary lane markings. Speed limit 45 MPH. Width limit 12'0". Until October 27, 2019 at about 5:00PM PDT. Between Big Canyon Road and Bobbit Bench Road (4 miles west of the Orofino area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until September 27, 2019 at about 6:00PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Road construction work is in progress due to bridge construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Width limit 14'0". Speed limit 55 MPH. Until October 16, 2019 at about 11:59PM PDT. Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until October 1, 2019 at about 5:00PM PDT. Between Garden Gulch Road and Vale Road (6 miles east of the Onaway area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until September 26, 2019 at about 7:00PM PDT. Between Exit 14: 15th Street and Exit 22: ID 97 (2 miles east of the Coeur d'Alene area). There are alternating lane closures. Drive with extreme caution. Advisory speed limit 55 MPH. From 6:00AM PDT to 3:00PM PDT on Monday, Tuesday, Wednesday and Thursday. For the next two weeks. Between County Road 58 and County Road 56 (9 miles north of the Bonners Ferry area). There are temporary lane markings. Between I-90 (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic. Between US 2 and Marion Avenue (near Oldtown). Bridge construction work is in progress. Look out for flaggers. Speed limit 25 MPH. Width limit 11'0". Until October 18, 2019 at about 4:30PM PDT.
ID 6 in both directions: Road construction, bridge construction, work on the shoulder, look out for flagger, width limit in effect, roadway reduced to one lane. Width limit 12'0". Expect 5 - minute delays.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, single line traffic - alternating direction. Speed limit 35 MPH. Width limit 16'0". Expect 15 - minute delays.
ID 64: Length limit in effect. Vehicle length limit 65 ft.
US 95 in both directions: Intermittent lane closure, roadway reduced to one lane, due to bridge construction work. Speed limit 45 MPH. Width limit 14'0".
US 95: Road reconstruction. Width limit 11'0".
ID 6: Road construction, paving operation, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
US 12 in both directions: Bridge construction, delay, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
ID 8: Road construction, paving operation, work on the shoulder, roadway reduced to one lane, delay, look out for flagger. Expect 15 - minute delays. Width limit 12'0".
ID 11 in both directions: Bridge construction, delay, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
ID 11 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
US 95 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect, look out for flagger. Width limit 12'0". Expect 15 - minute delays.
ID 97 in both directions: Length limit in effect. Vehicle length limit 65 ft.
I-90 in both directions: Narrow lane, due to long term road construction work, a mandatory speed limit is in force, temporary lane marking. Speed limit 45 MPH. Width limit 12'0".
US 12: Road construction, work on the shoulder, roadway reduced to one lane, delay, pilot car in operation, look out for flagger, width limit in effect. Width limit 12'0".
I-90 in both directions: Road construction, due to bridge construction work, roadway reduced to one lane, speed restrictions in force, width limit in effect, narrow lane. Width limit 14'0". Speed limit 55 MPH.
ID 60 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Expect 15 - minute delays. Width limit 10'6".
ID 53: Bridge construction, road closed, consider using an alternate route, detour in operation, see map for detour(s).
ID 41 southbound: Bridge construction, look out for flagger. Speed limit 25 MPH. Width limit 11'0".
US 95: Bonners Ferry
Lewiston Weigh Station
Bonners Ferry Weigh Station
I-90: Lookout Pass
ID 3: Kendrick
US 95: Whitebird Hill
Huetter Weigh Station
US 95: Lewiston Hill
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations