ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.
ID 55: Road construction.

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MST.

Web Comment: Valley gutters running parallel with and along Highway 55. (Requires Closures)* - Bridge deck construction for the north half of the new bridge. - Wall construction for the new park access on the northwest side of the bridge. The anticipated roadwork closures will be conducted for valley gutter installation along Highway 55. The following are the anticipated closure locations, closure type, and dates: · Front Street (Full Closure, Anticipated Dates 10/28 – 11/01/2019) · Edwards Street (Full Closure, Anticipated Dates 10/28 – 11/01/2019) · Bruneau Hwy, North and South Side of the Highway (Flagged Partial Closure on South Side and Full Closure on North Side, Anticipated Dates 11/06/2019)

Last updated on October 29
ID 55: Road construction.
Map of ID 55: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations