Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-84 in both directions: Road construction, paving operation, roadway reduced to two lane, follow the sign, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".
I-84 in both directions: Road construction.

Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Westbound lanes will be closed. Traffic will be moved via crossovers into the eastbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on October 1
I-84 in both directions: Road construction.
Map of I-84 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations