Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 20: Road construction, work on the shoulder, width limit in effect, speed restrictions in force. Width limit 12'0". Speed limit 45 MPH.
US 20: Road construction.

Between ID 16 and North Linder Road (1 to 3 miles west of the Eagle area). Road construction work is in progress. There is work on the shoulder. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 45 MPH. Until November 30, 2020 at about 11:59PM MDT.

Web Comment: Paving operations to widen the highway to two-lanes in each direction is underway between Linder Road and Tree Farm Way, including night work. During the evening, north-south motorists can expect flagger control and periodic delays at Tree Farm, Ten Mile Road and Long Lake Way.

Last updated on July 10
See Boise area traffic map
US 20: Road construction.
Map of US 20: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations