Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 26: Bridge construction, roadway reduced to one lane, single line traffic - alternating direction, temporary traffic light, delay, width limit in effect, speed restrictions in force, detour in operation, follow the detour sign, see map for detour(s). Speed limit 35 MPH. Width limit 15'0".
US 26: Bridge construction.

Between Jacobsen Lane and Moreland Road (3 miles west of the Blackfoot area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. Look out for temporary traffic lights. Expect delays. There is a width limit in effect. Speed restrictions are in force. A detour is in operation. Follow the detour signs. Speed limit 35 MPH. Width limit 15'0". Until March 20, 2020 at about 11:59PM MST.

Web Comment: Cannon Builders: Aaron Christenson (208) 680-6286; Roundabout Traffic Control: Kenton Robertson (208) 360-6381; Idaho Transportation Department: Zak Johnson (208) 239-3363

Last updated on November 15
US 26: Bridge construction.
Map of US 26: Bridge construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations