Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 11 in both directions: Bridge construction, delay, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
ID 11 in both directions: Bridge construction.

Between US 12 and Woodland Grade Road (16 miles south of the Weippe area). Bridge construction work is in progress. Expect delays. There is a width limit in effect. Expect 15 - minute delays. Width limit 11'0". Until October 7, 2019 at about 6:00PM PDT.

Web Comment: Silica fume concrete overlay, silane protective treatment for the bridge curb, joint replacement, Delaware rail retrofit, and painting steel girders. Guardrail and approach work from SH-11 MP 0.01- 0.074 Portable traffic signals will be placed at the intersection of the Greer Bridge and US-12 MP 51.5. Motorists, please yield to the traffic signals, and use caution when traveling through the bridge work zone

Last updated on August 21
ID 11 in both directions: Bridge construction.
Map of ID 11 in both directions: Bridge construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations