Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect, look out for flagger. Width limit 12'0". Expect 15 - minute delays.
US 95 in both directions: Road construction.

Between Hall Mountain Road and County Road 34 (20 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Look out for flaggers. Width limit 12'0". Expect 15 - minute delays. Until November 22, 2019 at about 8:00PM PDT.

Web Comment: The project will consist of grinding out areas where the plantmix is distressed and replacing with new plantmix. Transverse cracks will be routed and filled and the entire road surface will have a smoothness grind and overlay. Signs, sign posts and delineators will be replaced in their existing locations. Pavement markings will be repainted by contractor.

Last updated on October 11
US 95 in both directions: Road construction.
Map of US 95 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations