Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-86: Road construction, work on the shoulder, work in the median, bridge construction, left lane closed, reduce your speed, width limit in effect. Speed limit 65 MPH. Width limit 14'0".
I-86: Road construction.

Between Exit 1: I-84 and Eastbound Coldwater Rest Area (22 to 24 miles west of the American Falls area). Road construction work is in progress. There is work on the shoulder. People are working in the median. Bridge construction work is in progress. The left lane is closed. Reduce your speed. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". From 6:30AM MDT to 6:30PM MDT on weekdays. Until December 1, 2019 at about 6:30PM MDT.

Web Comment: Two way traffic to allow work in the median to remove rock outcroppings, bridge demolition on the West bound lanes. Contractor is Western Construction 208-345-1440 Traffic Control Shawn Dourgherty 716-9736 and Aaron Dial 521-5693

Last updated on October 10
I-86: Road construction.
Map of I-86: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations