Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.
ID 55: Road construction.

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Paving operations will require road closures at all intersecting roads on the south side of Highway 55. These closures will prevent traffic from accessing Highway 55 from the south side of highway. All northern access at these intersections will be open to traffic. Paving operations will begin June 19th and expected to continue for 2 to 3 days. Highway 78 paving preparation and paving work is anticipated to be conduction June 14th and June 17th to the end of the paving operation as mentioned above. Throughout the Highway 78 paving operations, an anticipated detour for all Highway 55 to Highway 78 truck traffic, and vice versa, will be directed to Bruneau Highway and E. Pershall Road.

More Info: Press Release

Last updated on June 14
ID 55: Road construction.
Map of ID 55: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations