Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect. Expect 5 - minute delays. Width limit 11'0".
ID 55: Road construction.

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 11'0". Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Roadway excavation on the north side of Highway 55 from Riverfront Dr. to Reich St. Storm Sewer installation from C-Line Canal (MP 2.1) west towards SH-78. Storm Sewer installation from School Drain (MP 1.65) east towards SH-78. Bridge demolition on north half of the bridge. Bridge traffic will be signalized 24 hours a day and restricted to a single lane for the length of the bridge. The single lane will be used by both directions of traffic. Single lane restriction will begin April 8, 2019

More Info: Press Release

Last updated yesterday at 6:54pm MDT
ID 55: Road construction.
Map of ID 55: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations