Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 26 in both directions: Road construction, bridge construction, roadway reduced to one lane, temporary traffic light, speed restrictions in force, width limit in effect. Width limit 12'0". Speed limit 35 MPH.
US 26 in both directions: Road construction.

Between Clark Road and Bond Road (1 mile west of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Speed limit 35 MPH. Until April 15, 2019 at about 5:00PM MST.

Web Comment: Wadsworth Brothers Construction is re-constructing the Danskin Canal bridge. For loads wider than 12'0" contact Bryan Young at 208-745-5682.

Last updated today at 1:24pm MST
US 26 in both directions: Road construction.
Map of US 26 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations