Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 39 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge construction, work on the shoulder, delays, consider using an alternate route, speed restrictions in force, width limit in effect.
ID 39 in both directions: Roadway reduced to one lane.

Between Hoff Road and Fleetwood Drive (2 to 7 miles west of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. Expect delays. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0". Until June 30, 2018 at about 5:30PM MDT.

Web Comment: The People's Canal Bridge on State Highway 39, between mileposts 45 and 50, is being replaced. Road reduced to one lane over the bridge. Lane closure in effect 24 hours a day, seven days a week. Traffic signals are in place. Use caution around crews and equipment.

Last updated yesterday at 8:34am MDT
ID 39 in both directions: Roadway reduced to one lane.
Map of ID 39 in both directions: Roadway reduced to one lane.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations