Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Highways
ID 1 No Reports
US 2 No Reports
ID 3 No Reports
ID 4 No Reports
ID 5 No Reports
ID 6 2 Reports
ID 7 No Reports
ID 8 1 Report
ID 9 No Reports
ID 11 2 Reports
US 12 1 Report
ID 13 No Reports
ID 14 No Reports
I-15 2 Reports
I-15B No Reports
ID 16 No Reports
ID 19 No Reports
US 20 5 Reports
ID 21 1 Report
ID 22 No Reports
ID 24 1 Report
ID 25 No Reports
US 26 2 Reports
ID 27 No Reports
ID 28 1 Report
ID 29 1 Report
US 30 5 Reports
ID 31 No Reports
ID 32 No Reports
ID 33 No Reports
ID 34 No Reports
ID 36 No Reports
ID 37 No Reports
ID 38 1 Report
ID 39 No Reports
ID 40 No Reports
ID 41 1 Report
ID 43 No Reports
ID 44 No Reports
ID 45 No Reports
ID 46 No Reports
ID 47 No Reports
ID 48 No Reports
ID 50 No Reports
ID 51 No Reports
ID 52 1 Report
ID 53 1 Report
ID 54 No Reports
ID 55 1 Report
ID 57 No Reports
ID 58 No Reports
ID 60 1 Report
ID 61 No Reports
ID 62 No Reports
ID 64 1 Report
ID 66 No Reports
ID 67 No Reports
ID 69 No Reports
ID 71 1 Report
ID 72 No Reports
ID 74 No Reports
ID 75 1 Report
ID 77 No Reports
ID 78 No Reports
ID 81 No Reports
I-84 4 Reports
I-84B 1 Report
I-86 2 Reports
ID 87 No Reports
US 89 No Reports
I-90 2 Reports
US 91 No Reports
US 93 2 Reports
US 95 7 Reports
ID 97 1 Report
ID 99 No Reports
ID 128 No Reports
ID 162 No Reports
ID 167 No Reports
I-184 No Reports
ID 200 No Reports
Truck Restrictions—Southeast Idaho
Map of Southeast Idaho Between Fillmore Street/Bridgeview Boulevard and Golf Course Road (near Twin Falls). Bridge maintenance work is in progress. The roadway is reduced to one lane. The right lane is closed. Lane control signs are operating. Consider using an alternate route. There is a width limit in effect. Width limit 12'0". Until today at about 3:00PM MDT. Between I-84 (1 mile west of the Bliss area) and A Avenue (near Bliss). The road is closed. Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. Until November 30, 2019 at about 7:00PM MDT. Between West Pine Creek Road and Pine Creek Pass (8 miles west of the Victor area). There is work on the shoulder. Between Johnson Road and McKim Creek Road (19 miles north of the Challis area). There is danger of a rock fall. Drive with extreme caution. Between Thompson Creek Road (5 miles south of the Clayton area) and US 93 (20 miles north of the Clayton area). There is danger of a rock fall. Drive with extreme caution. Between Maires Lane - D-C Bar Road (15 miles north of the Leadore area) and Seventeen Mile Lane (18 miles south of the Salmon area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Traffic is being held. Expect delays. Speed restrictions are in force. Width limit 11'0". Until November 29, 2019 at about 5:00AM MDT. Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 40: Arimo Road (near Arimo). The road is being reconstructed. There is a width limit in effect. Speed limit 55 MPH. Until October 25, 2019 at about 11:59PM MDT. Between Georgetown Summit (3 miles west of the Georgetown area) and Nounan Road (near Georgetown). Major road construction work is in progress. Road construction work is in progress. There is a width limit in effect because of construction work and due to road work. Width limit 12'0". Until September 30, 2019 at about 11:59PM MDT. Between Redfish Lake Road (near Stanley) and Squaw Creek Road (5 miles south of the Clayton area). There is danger of a rock fall. Drive with extreme caution. Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until December 2, 2019 at about 11:59PM MDT. Between Exit 168: Jerome/Lincoln Street and Exit 173: US 93 (3 miles east of the Jerome area). Paving operations. Width limit in effect. Eastbound traffic. Roadway reduced to one lane. Right lane closed. Look out for flaggers. Width limit 12'0". Starting tomorrow at 8:30AM MDT until tomorrow at about 5:30PM MDT. Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until October 31, 2019 at about 5:00PM MDT. Between 2400 North Road (near Butte City) and Brunt Road (24 miles west of the Idaho Falls area). Look out for large animals on the roadway. Be aware of the animal crossing area. Drive with extreme caution. Between Exit 337: Salem Road (near Rexburg) and The Truck Scale Port of Entry (4 miles west of the Ashton area). Look out for construction work. The roadway is reduced to one lane. There is a width limit in effect. Between Robinson Bar Road (15 miles north of the Stanley area) and Slate Creek Road (15 miles south of the Clayton area). Road construction work is in progress. The roadway is reduced to one lane. Follow the signs. Look out for flaggers. Look out for temporary traffic lights. Reduce your speed. Width limit 14'0". From 7:30AM MDT to 12:30PM MDT on Friday and from 7:30AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until October 4, 2019 at about 5:30PM MDT. Between Exit 1: I-84 and Exit 15: Raft River (36 to 37 miles west of the American Falls area). Look out for long term road construction work. The roadway is reduced to one lane. Speed restrictions are in force. Be aware of narrow lanes. There is a width limit in effect. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". Until November 20, 2019 at about 6:00PM MDT. Between The Menan-Lorenzo Highway and 6800 South Road (3 miles east of the Rigby area). Bridge maintenance work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 60 MPH. Until today at about 8:00PM MDT. Between I-84 and 300 South Road (3 to 5 miles north of the Twin Falls area). There is work on the shoulder. Utility work is in progress. Until October 11, 2019 at about 5:00PM MDT. Between Exit 1: I-84 and Eastbound Coldwater Rest Area (22 to 24 miles west of the American Falls area). Road construction work is in progress. There is work on the shoulder. People are working in the median. Bridge construction work is in progress. The left lane is closed. Reduce your speed. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". From 6:30AM MDT to 6:30PM MDT on weekdays. Until December 1, 2019 at about 6:30PM MDT. Between Tin Cup Road and The Wyoming State Line (40 to 52 miles east of the Soda Springs area). Road maintenance work is in progress. A lane is closed intermittently. Look out for flaggers. Until Friday, at about 11:59PM MDT. Between Redfish Lake Road (near Stanley) and Squaw Creek Road (5 miles south of the Clayton area). Look out for large animals on the roadway. Between North River Road and 2050 North Road (1 to 4 miles east of the Ashton area). Major road construction work is in progress. Traffic is heavy. Traffic is backed up. Be aware of narrow lanes because a lane is closed. Speed limit 45 MPH. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until tomorrow at about 6:00PM MDT. Between Edwards Road and Arbon Valley Road (6 to 13 miles west of the Malad City area). There is work on the shoulder. Until September 26, 2019 at about 4:00PM MDT. Between South 1850 East Road and South 1150 East Road (7 to 8 miles west of the Dietrich area). Road maintenance work is in progress. The roadway is reduced to one lane. The right lane is closed. Traffic is slow. Consider using an alternate route. There is a width limit in effect. Width limit 12'0". Until today at about 5:30PM MDT. Between I-15; Devil Creek Road and 90 South Street (near Malad City). Road construction work is in progress. The shoulder is closed. A detour is in operation. The exit ramp is closed. South. Until October 4, 2019 at about 7:00PM MDT. Between US 20 and Ebor Reactor Road (10 to 43 miles west of the Mud Lake area). Look out for large animals on the roadway. Be aware of the animal crossing area. Drive with extreme caution. Between Lee Creek Road (Leadore) and Baker Lane (8 miles south of the Salmon area). Road maintenance work is in progress. Until September 30, 2019 at about 5:00PM MDT. Between Exit 216: ID 25; ID 77 and Exit 228 (9 to 12 miles east of the Heyburn area). Look out for construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". Until November 20, 2019 at about 6:00PM MDT. Between Old Highway 28; The Hawley Creek Road and The Montana State Line (13 miles north of the Leadore area). Road maintenance work is in progress. Until October 31, 2019 at about 5:00PM MDT. Between South County Line Road and South Apple Road (3 miles south of the Shoshone area). Road construction work is in progress. The road is being repaved. Reduce your speed. Observe the signs. Speed limit 55 MPH. From 6:00AM MDT to 6:00PM MDT on weekdays. Until October 31, 2019 at about 6:00AM MDT. Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. There is work on the shoulder. Until Friday, at about 11:59PM MDT. Between ID 45 (24 miles west of the Grand View area) and ID 167 (Grand View). There is work on the shoulder due to roadside mowing. Until tomorrow at about 4:30PM MDT.
US 26 westbound: Height limit in effect. Height limit 13'8".
US 20 in both directions: Construction work, roadway reduced to one lane, width limit in effect.
ID 75 in both directions: Road construction, roadway reduced to one lane, follow the sign, look out for flagger, temporary traffic light, reduce your speed. Width limit 14'0".
I-86 in both directions: Long term road construction, roadway reduced to one lane, speed restrictions in force, narrow lane, width limit in effect, drive with extreme caution. Speed limit 55 MPH. Width limit 12'0".
US 20: Bridge maintenance operation, roadway reduced to one lane, width limit in effect, speed restrictions in force. Width limit 14'0". Speed limit 60 MPH.
ID 29: Length limit in effect, width limit in effect, due to bridge construction work. Vehicle length limit 50 ft. Width limit 13'0".
US 93 in both directions: Bridge maintenance operation, roadway reduced to one lane, right lane closed, lane control signs operating, consider using an alternate route, width limit in effect. Width limit 12'0".
ID 21: Length limit in effect. Vehicle length limit 65 ft.
I-84B in both directions: Road closed, road construction, bridge construction, paving operation.
I-86: Road construction, work on the shoulder, work in the median, bridge construction, left lane closed, reduce your speed, width limit in effect. Speed limit 65 MPH. Width limit 14'0".
US 30 westbound: Height limit in effect. Height limit 13'7".
I-84 in both directions: Bridge construction, roadway reduced to one lane, follow the sign, consider using an alternate route, width limit in effect. Width limit 14'0".
US 20 in both directions: Major road construction, heavy traffic, long queue, narrow lane, because a lane is closed. Speed limit 45 MPH. Width limit 12'0".
ID 28: Bridge construction, roadway reduced to one lane, temporary traffic light, traffic held, speed restrictions in force. Width limit 11'0".
I-15 in both directions: Road reconstruction, width limit in effect, see map for detour(s). Speed limit 55 MPH.
US 30 eastbound: Height limit in effect. Height limit 13'5".
US 30 in both directions: Major road construction, road construction, width limit in effect, because of construction work, due to road work. Width limit 12'0".
US 30 eastbound: Bridge construction, road construction, roadway reduced to one lane, look out for flagger. Width limit 13'0".
US 26 eastbound: Height limit in effect. Height limit 13'8".
ID 24 eastbound: Road maintenance operation, roadway reduced to one lane, right lane closed, slow traffic, consider using an alternate route, width limit in effect. Width limit 12'0".
US 20 in both directions: Road construction, bridge construction, work on the shoulder, paving operation, roadway reduced to one lane, delay, look out for flagger, drive carefully, speed restrictions in force, width limit in effect, consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0".
ID 38 in both directions: Road construction, shoulder closed, detour in operation, exit ramp closed, south, see map for detour(s).
US 20 in both directions: Road construction, bridge construction, work on the shoulder, paving operation, roadway reduced to one lane, look out for flagger, delay, drive carefully, speed restrictions in force, width limit in effect, consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0".
I-84: Paving operation, width limit in effect, eastbound traffic, roadway reduced to one lane, right lane closed, look out for flagger. Width limit 12'0".
I-84 in both directions: Construction work, roadway reduced to one lane, speed restrictions in force, width limit in effect, narrow lane, drive with extreme caution. Speed limit 55 MPH. Width limit 12'0".
I-15 in both directions: Bridge construction, right shoulder closed. Speed limit 65 MPH. Width limit 12'0".
Hollister Weigh Station
Cotterell Weigh Station
Sage Junction Weigh Station
Horseshoe Bend Weigh Station
East Boise Weigh Station
US 30: Fish Creek
Inkom Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations