Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Road Reports—North Idaho
Map of North Idaho Between Washington Street and Cedar Street (Priest River). Look out for construction work. The sidewalk is closed. The roadway is reduced to two lanes. Width limit 10'0". Until July 2, 2021 at about 5:00PM PDT. Between Myrtle Street (Grangeville) and Main Road (4 miles north of the Grangeville area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". Speed limit 30 MPH. Until July 13, 2021 at about 6:00PM PDT. Between ID 6 and Pettis Peak Road (10 miles south of the St. Maries area). There is work on the shoulder. Until June 18, 2021 at about 8:00PM PDT. Between US Route 95 Business (5 miles north of the Craigmont area) and Winchester-Culdesac Road (7 miles south of the Culdesac area). There is work on the shoulder. The roadway is reduced to two lanes. Expect delays. Look out for flaggers. Expect 5 - minute delays. Until June 18, 2021 at about 5:30PM PDT. Between 1st Street and Granite-Kelso Cut-Off Road (4 miles north of the Athol area). Road construction work is in progress due to road work. The right lane is closed. Speed limit 55 MPH. Width limit 16'0". From 6:00AM PDT to 4:30PM PDT on weekdays. Until December 31, 2022 at about 5:00PM PDT. Between Mullan Avenue and Prairie Avenue (1 mile north of the Post Falls area). Major road construction work is in progress. There is work on the shoulder. Look out for flaggers. Until November 30, 2022 at about 6:00PM PDT. Between Magpie Road and Amos Beach Road (18 to 19 miles west of the Orofino area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Width limit 10'0". Advisory speed limit 45 MPH. Until October 31, 2021 at about 5:00PM PDT. Between US 95B Craigmont (near Craigmont) and Frontage Road (near Culdesac). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. Expect 10 - minute delays. Until October 19, 2021 at about 5:30PM PDT. Between ID 53 and Ohio Match Road (2 miles north of the Hayden area). The intersecting road is closed. Bridge construction work is in progress. Follow the detour signs. Until November 30, 2021 at about 5:00PM PDT. Between Prairie Avenue (1 mile north of the Post Falls area) and California Street (Rathdrum). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. No passing. Width limit 14'0". Speed limit 45 MPH. From 7:00AM PDT to 5:00PM PDT on weekdays and Saturday. Between Ironwood Drive (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic.
ID 3: Road construction, roadway reduced to one lane, bridge construction, delays, width limit in effect.
ID 41: Intersecting road closed, follow the detour sign.
US 2: Construction work, sidewalk closed, roadway reduced to two lane.
US 95 northbound: Traffic congestion, delay.
ID 13: Road construction, paving operations, roadway reduced to one lane, delays, pilot car in operation, look out for flaggers, speed restrictions in force, width limit in effect.
ID 41: Intersecting road closed, follow the detour sign.
ID 3: Work on the shoulder.
US 95 in both directions: Work on the shoulder, roadway reduced to two lanes, delays, look out for flagger.
ID 8 in both directions: Paving operations, bridge maintenance operations, bridge construction, roadway reduced to one lane, delays, consider using an alternate route, reduce your speed, width limit in effect.
ID 8: Paving operations, bridge maintenance operations, bridge construction, roadway reduced to one lane, delays, consider using an alternate route, reduce your speed, width limit in effect.
ID 9 in both directions: Paving operations, bridge maintenance operations, bridge construction, roadway reduced to one lane, delays, consider using an alternate route, reduce your speed, width limit in effect.
US 95 in both directions: Road construction, due to road work, right lane closed.
US 95 in both directions: Bridge construction, bridge maintenance operations, width limit in effect.
ID 41 in both directions: Major road construction, work on the shoulder, look out for flagger.
US 12 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, reduce your speed, width limit in effect.
ID 11 in both directions: Road maintenance operations, roadway reduced to one lane, yield to oncoming traffic during construction, drive with extreme caution, width limit in effect, landslide, delay.
US 12 in both directions: Road construction, bridge maintenance operations, roadway reduced to one lane, delays, look out for flaggers, width limit in effect.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, delays, look out for flagger.
US 95 in both directions: Intersecting road closed, bridge construction, follow the detour sign.
ID 41 northbound: Road construction, bridge construction, work on the shoulder, no passing.
US 95: Rush hour traffic.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning