Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Road Reports
US 95 Whole Road 13 reports
Oregon to Payette 1 report
Payette to New Meadows 3 reports
New Meadows to Lewiston 2 reports
Lewiston to Coeur d'Alene No reports
Coeur d'Alene to Canada 7 reports
Reports on US 95
Map of Reports on US 95 Between US Route 95 Business (6 miles north of the Craigmont area) and Winchester-Culdesac Road (7 miles south of the Culdesac area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 13'0". Until October 1, 2020 at about 7:00PM PDT. Between Watson Street (near Culdesac) and Frontage Road (Lapwai). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until June 12, 2020 at about 11:59PM PDT. Between I-90 (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic. Between Neider Avenue and Hanley Avenue (Coeur d'Alene). Look out for long term road construction work. Look out for temporary traffic lights. From 12:00AM PDT to 12:00AM PDT daily. Until Monday, at about 5:00PM PDT. Between West Boekel Road and West Garwood Road; East Garwood Road (2 miles north of the Hayden area). Bridge construction work is in progress. The roadway is reduced to one lane. Until June 12, 2020 at about 5:00PM PDT. Between West Center Valley Road (4 miles north of the Ponderay area) and County Road 19 (Bonners Ferry). Road maintenance work is in progress. From 6:00AM PDT to 4:00PM PDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 4:00PM PDT. Between Fry Street and Ash Street (Bonners Ferry). Road construction work is in progress. Look out for flaggers. Width limit 12'0". Until June 30, 2020 at about 5:00PM PDT.
US 95: Utility work, roadway reduced to one lane, right lane closed.
US 95: Utility work, roadway reduced to one lane, look out for flaggers, short delay.
US 95: Road maintenance operations, work on the shoulder.
US 95: Bridge construction, roadway reduced to one lane, temporary traffic lights, speed restrictions in force, width limit in effect.
US 95 in both directions: Road construction, bridge construction, work on the shoulder, delays, look out for flaggers, speed restrictions in force, width limit in effect.
US 95 in both directions: Road construction, paving operations, work on the shoulder, roadway reduced to one lane, delays, pilot car in operation, look out for flaggers, width limit in effect.
US 95: Rush hour traffic.
US 95: Long term road construction, temporary traffic light.
US 95 northbound: Bridge construction, roadway reduced to one lane.
US 95 in both directions: Roadway reduced to one lane, due to bridge construction work.
US 95: Roadway reduced to one lane, due to bridge construction work.
US 95: Road maintenance operation.
US 95: Road construction, look out for flagger.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning