Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on ID 55
Map of Reports on ID 55 Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 11'0". Until June 15, 2020 at about 7:00PM MDT. Between Spring Creek Way (5 miles north of the Eagle area) and Horseshoe Bend Hill Summit (7 miles south of the Horseshoe Bend area). Road construction work is in progress. Speed restrictions are in force. Speed limit 40 MPH. Until May 10, 2019 at about 11:59PM MDT. Between Sportsman Access and Smith's Ferry Drive - High Valley Road (14 to 20 miles south of the Cascade area). Look out for potholes. Drive carefully. Until April 29, 2019 at about 12:00PM MDT.
ID 55: Road construction, roadway reduced to one lane, observe signals, look out for flaggers, delays, width limit in effect.
ID 55: Road construction, speed restrictions in force.
ID 55: Potholes, drive carefully.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info