Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Road Reports
I-84 Whole Road 8 reports
Oregon to Boise 3 reports
Boise to Twin Falls 3 reports
Twin Falls to I-86 Junction 3 reports
I-86 Junction to Utah 1 report
Reports on I-84
Map of Reports on I-84 Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic. Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. From 9:00PM MDT to 5:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT. Between Exit 36 (Nampa) and Exit 44 (near Meridian). Look out for rush hour traffic. Between Exit 112 (5 miles west of the Glenns Ferry area) and Exit 125: 18th East Street (near Glenns Ferry). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until November 9, 2020 at about 11:59PM MDT. Between Exit 125: 18th East Street and I-84B Hammett (near Glenns Ferry). The entrance ramp is closed due to road construction work. Follow the detour signs. Width limit 14'0". Until today at about 12:00PM MDT. Between Exit 165 (near Jerome) and ID 50 (8 miles west of the Hazelton area). Road construction work is in progress. There is a width limit in effect. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. Speed limit 70 MPH. Width limit 12'0". Until November 20, 2020 at about 5:30PM MDT. Between ID 25 and Exit 201: Kasota Road (4 to 6 miles east of the Hazelton area). Road construction work is in progress. There is a width limit in effect. Road maintenance work is in progress. Look out for mobile maintenance operations. Bridge maintenance work is in progress. Bridge construction work is in progress. A seal coat treatment has been applied. The roadway is reduced to one lane. The right lane is closed. Speed restrictions are in force. Speed limit 65 MPH. Width limit 12'0". Until today at about 6:00PM MDT. Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.
I-84: Rush hour traffic.
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Rush hour traffic.
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force.
I-84 westbound: Entrance ramp closed, due to road construction work, follow the detour signs, see map for detour(s).
I-84 in both directions: Road construction, width limit in effect, work on the shoulder, work in the median, paving operations, observe signs, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force.
I-84 eastbound: Road construction, width limit in effect, road maintenance operations, mobile maintenance operations, bridge maintenance operations, bridge construction, seal coat, roadway reduced to one lane, right lane closed, speed restrictions in force.
I-84 in both directions: Road construction, paving operations, roadway reduced to two lanes, follow the signs, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning