Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Road Reports
US 26 Whole Road 1 report
Bliss to Carey No reports
Atomic City to Blackfoot 1 report
Idaho Falls to Wyoming No reports
Reports on US 26
Map of Reports on US 26 Between Jacobsen Lane and Moreland Road (3 miles west of the Blackfoot area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. Look out for temporary traffic lights. Expect delays. There is a width limit in effect. Speed restrictions are in force. A detour is in operation. Follow the detour signs. Speed limit 35 MPH. Width limit 15'0". Until March 20, 2020 at about 11:59PM MST.
US 26: Bridge construction, roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights, delays, width limit in effect, speed restrictions in force, detour in operation, follow the detour signs, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info