I-84: Twin Falls to I-86 Junction
I-84 in both directions: Road construction, width limit in effect, work on the shoulder, work in the median, paving operations, observe signs, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force.
Between Exit 165 (near Jerome) and ID 50 (8 miles west of the Hazelton area). Road construction work is in progress. There is a width limit in effect. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. Speed limit 70 MPH. Width limit 12'0". Until November 20, 2020 at about 5:30PM MDT.
I-84 in both directions: Road construction, paving operations, roadway reduced to two lanes, follow the signs, speed restrictions in force, width limit in effect.
Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84: Twin Falls to I-86 Junction
Map of Reports on I-84 Between Exit 165 (near Jerome) and ID 50 (8 miles west of the Hazelton area). Road construction work is in progress. There is a width limit in effect. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. Speed limit 70 MPH. Width limit 12'0". Until November 20, 2020 at about 5:30PM MDT. Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.
I-84 in both directions: Road construction, width limit in effect, work on the shoulder, work in the median, paving operations, observe signs, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force.
I-84 in both directions: Road construction, paving operations, roadway reduced to two lanes, follow the signs, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning