US 95: New Meadows to Lewiston
US 95 in both directions: Road construction, paving operations, work on the shoulder, roadway reduced to two lanes, width limit in effect.
Between Banner Ridge Road and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to two lanes. There is a width limit in effect. Width limit 12'0". Until Thursday, at about 5:00PM PDT.
US 95 in both directions: Road construction, drive with extreme caution, delays, bridge construction, work on the shoulder, reduce your speed, rough road, look out for flagger.
Between US Route 95 Business and Winchester-Culdesac Road (6 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Bridge construction work is in progress. There is work on the shoulder. Reduce your speed. The road is rough. Look out for flaggers. Truck speed limit 35 MPH. Speed limit 35 MPH. Until October 31, 2019 at about 11:59PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95: New Meadows to Lewiston
Map of Reports on US 95 Between Banner Ridge Road and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to two lanes. There is a width limit in effect. Width limit 12'0". Until Thursday, at about 5:00PM PDT. Between Banner Ridge Road and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to two lanes. There is a width limit in effect. Width limit 12'0". Until Thursday, at about 5:00PM PDT. Between US Route 95 Business and Winchester-Culdesac Road (6 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Bridge construction work is in progress. There is work on the shoulder. Reduce your speed. The road is rough. Look out for flaggers. Truck speed limit 35 MPH. Speed limit 35 MPH. Until October 31, 2019 at about 11:59PM PDT.
US 95 in both directions: Road construction, paving operations, work on the shoulder, roadway reduced to two lanes, width limit in effect.
US 95 in both directions: Road construction, drive with extreme caution, delays, bridge construction, work on the shoulder, reduce your speed, rough road, look out for flagger.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info