Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 30: Bliss to Burley
US 30 eastbound: Bridge construction, road construction, roadway reduced to one lane, look out for flagger.
Between 4800 North Road and 4600 North Road (8 miles east of the Hagerman area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Width limit 13'0". From 6:00AM MDT to 6:00PM MDT on weekdays. Until April 30, 2020 at about 6:00PM MDT.
US 30: Road construction, work on the shoulder, roadway reduced to one lane, look out for flaggers, width limit in effect.
Between 200 South Road - 700 West Road and 500 West Road (5 to 6 miles west of the Burley area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. There is a width limit in effect. Width limit 14'0". From 8:00AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Wednesday, at about 5:30PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 30: Bliss to Burley
Map of Reports on US 30 Between 200 South Road - 700 West Road and 500 West Road (5 to 6 miles west of the Burley area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. There is a width limit in effect. Width limit 14'0". From 8:00AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Wednesday, at about 5:30PM MDT.
US 30 eastbound: Bridge construction, road construction, roadway reduced to one lane, look out for flagger.
US 30: Road construction, work on the shoulder, roadway reduced to one lane, look out for flaggers, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info