Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 30: Bliss to Burley
US 30: Bridge construction, roadway reduced to one lane, width limit in effect.
At I-84 (3 miles east of the New Plymouth area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Width limit 10'0". Until October 18, 2019 at about 11:59PM MDT.
US 30 eastbound: Bridge construction, road construction, roadway reduced to one lane, look out for flagger.
Between 4800 North Road and 4600 North Road (8 miles east of the Hagerman area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Width limit 13'0". From 6:00AM MDT to 6:00PM MDT on weekdays. Until April 30, 2020 at about 6:00PM MDT.
US 30 eastbound: Work on the shoulder, roadway reduced to one lane, right lane closed.
Between 3900 North Road and 2300 East Road (near Filer). There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Until Thursday, at about 5:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 30: Bliss to Burley
Map of Reports on US 30 Between 3900 North Road and 2300 East Road (near Filer). There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Until Thursday, at about 5:00PM MDT.
US 30: Bridge construction, roadway reduced to one lane, width limit in effect.
US 30 eastbound: Bridge construction, road construction, roadway reduced to one lane, look out for flagger.
US 30 eastbound: Work on the shoulder, roadway reduced to one lane, right lane closed.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info