I-15 in both directions: Bridge construction, right shoulder closed.
Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until October 31, 2019 at about 5:00PM MDT.
I-15: Road construction, bridge construction, work in the median, observe speed limit.
Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until November 1, 2019 at about 11:59PM MDT.
I-15 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, seal coat.
Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. A seal coat treatment has been applied. Speed limit 60 MPH. Advisory speed limit 45 MPH. Width limit 16'0". Until September 13, 2019 at about 11:59PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15: Pocatello to Montana
Map of Reports on I-15 Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until October 31, 2019 at about 5:00PM MDT. Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until November 1, 2019 at about 11:59PM MDT. Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. A seal coat treatment has been applied. Speed limit 60 MPH. Advisory speed limit 45 MPH. Width limit 16'0". Until September 13, 2019 at about 11:59PM MDT.
I-15 in both directions: Bridge construction, right shoulder closed.
I-15: Road construction, bridge construction, work in the median, observe speed limit.
I-15 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, seal coat.