I-15: Pocatello to Montana
I-15 in both directions: Night time construction work, seal coat, lane closed, observe signs, observe speed limits, look out for flaggers, ramp restrictions in force, on ramp.
Between The Inkom Port of Entry (near Pocatello) and Exit 80: Fort Hall (Fort Hall). Night time construction work is in progress. A seal coat treatment has been applied. A lane is closed. Observe the signs. Observe speed limits. Look out for flaggers. Ramp restrictions are in force. On ramps. Width limit 10'0". Until tomorrow at about 7:00AM MDT.
I-15: Work on the shoulder, speed restrictions in force.
Between Exit 89: US 91; Interstate 15 Business and Exit 93: US 26 (near Blackfoot). There is work on the shoulder. Speed restrictions are in force. Speed limit 65 MPH.
I-15: Bridge maintenance operation.
Between Exit 113: Interstate 15 Business and Exit 116: I-15B; Sunnyside Rd (near Idaho Falls). Bridge maintenance work is in progress. Until Tuesday, at about 7:00PM MDT.
I-15 in both directions: Bridge construction.
Between Exit 119: US 20 and Exit 128: Osgood Road (near Idaho Falls). Bridge construction work is in progress. Until July 24, 2020 at about 7:00PM MDT.
I-15: Road construction.
Between Exit 150: Hamer Road (2 miles north of the Hamer area) and Exit 167: ID 22 (5 miles south of the Dubois area). Road construction work is in progress. Width limit 16'0". Speed limit 65 MPH. Until August 28, 2020 at about 11:59PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15: Pocatello to Montana
Map of Reports on I-15 Between The Inkom Port of Entry (near Pocatello) and Exit 80: Fort Hall (Fort Hall). Night time construction work is in progress. A seal coat treatment has been applied. A lane is closed. Observe the signs. Observe speed limits. Look out for flaggers. Ramp restrictions are in force. On ramps. Width limit 10'0". Until tomorrow at about 7:00AM MDT. Between Exit 89: US 91; Interstate 15 Business and Exit 93: US 26 (near Blackfoot). There is work on the shoulder. Speed restrictions are in force. Speed limit 65 MPH. Between Exit 150: Hamer Road (2 miles north of the Hamer area) and Exit 167: ID 22 (5 miles south of the Dubois area). Road construction work is in progress. Width limit 16'0". Speed limit 65 MPH. Until August 28, 2020 at about 11:59PM MDT.
I-15 in both directions: Night time construction work, seal coat, lane closed, observe signs, observe speed limits, look out for flaggers, ramp restrictions in force, on ramp.
I-15: Work on the shoulder, speed restrictions in force.
I-15: Bridge maintenance operation.
I-15 in both directions: Bridge construction.
I-15: Road construction.