Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Oregon to Boise
I-84: Road construction, roadway reduced to one lane, width limit in effect, height limit in effect.
At The Oregon State Line (near Fruitland). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is a height limit in effect. Width limit 12'0". Height limit 18'6". Until September 30, 2019 at about 11:59PM MDT.
I-84: Road maintenance operations, slow moving maintenance vehicle.
Between Exit 3: US 95 and Exit 17: Sand Hollow (8 to 12 miles east of the Fruitland area). Road maintenance work is in progress. Look out for a slow moving maintenance vehicle. From 8:00AM MDT to 4:00PM MDT on Monday and Tuesday. Until today at about 4:00PM MDT.
I-84: Road construction, bridge maintenance operations, roadway reduced to one lane.
Between Exit 17: Sand Hollow and Exit 25: ID 44 (2 miles west of the Caldwell area). Road construction work is in progress. Bridge maintenance work is in progress. The roadway is reduced to one lane. Until September 27, 2019 at about 11:59PM MDT.
I-84: Rush hour traffic.
Today at 6:49 AM, Google reported a 14 minute delay eastbound. Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic.
I-84: Bridge construction, roadway reduced to one lane, speed restrictions in force.
Today at 6:49 AM, Google reported a 13 minute delay eastbound. Between Exit 29: US 20; Franklin Road and Exit 36 (near Nampa). Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 11, 2019 at about 11:59PM MDT.
I-84 westbound: Road closed to traffic, detour in operation, see map for detour(s).
Today at 6:49 AM, Google reported a 13 minute delay eastbound. Between Exit 36 and Exit 29: US 20; Franklin Road (near Nampa). The road is closed to traffic. A detour is in operation. From 10:00PM MDT to 6:00AM MDT on Monday and Tuesday. Until tomorrow at about 6:00AM MDT.
I-84: Road construction, roadway reduced to one lane, speed restrictions in force.
Today at 6:49 AM, Google reported a 12 minute delay eastbound. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 6:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT.
I-84: Rush hour traffic.
Today at 6:49 AM, Google reported a 4 minute delay eastbound. Between Exit 36 (Nampa) and Exit 44: ID 69 (near Meridian). Look out for rush hour traffic.
I-84: Rush hour traffic.
Between Exit 44: ID 69 (Meridian) and Exit 52: Orchard Street (Boise). Look out for rush hour traffic.
I-84 eastbound: Utility work, work on the shoulder, on the on ramp.
At Exit 46: ID 55; Eagle Road (Meridian). Utility work is in progress. There is work on the shoulder. On the on ramp. From 9:00AM MDT to 8:00PM MDT on Monday, Tuesday and Wednesday. Until tomorrow at about 8:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84: Oregon to Boise
Map of Reports on I-84 Between Exit 3: US 95 and Exit 17: Sand Hollow (8 to 12 miles east of the Fruitland area). Road maintenance work is in progress. Look out for a slow moving maintenance vehicle. From 8:00AM MDT to 4:00PM MDT on Monday and Tuesday. Until today at about 4:00PM MDT. Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic. Between Exit 29: US 20; Franklin Road and Exit 36 (near Nampa). Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 11, 2019 at about 11:59PM MDT. Between Exit 36 and Exit 29: US 20; Franklin Road (near Nampa). The road is closed to traffic. A detour is in operation. From 10:00PM MDT to 6:00AM MDT on Monday and Tuesday. Until tomorrow at about 6:00AM MDT. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 6:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT. Between Exit 36 (Nampa) and Exit 44: ID 69 (near Meridian). Look out for rush hour traffic. Between Exit 44: ID 69 (Meridian) and Exit 52: Orchard Street (Boise). Look out for rush hour traffic.
I-84: Road construction, roadway reduced to one lane, width limit in effect, height limit in effect.
I-84: Road maintenance operations, slow moving maintenance vehicle.
I-84: Road construction, bridge maintenance operations, roadway reduced to one lane.
I-84: Rush hour traffic.
I-84: Bridge construction, roadway reduced to one lane, speed restrictions in force.
I-84 westbound: Road closed to traffic, detour in operation, see map for detour(s).
I-84: Road construction, roadway reduced to one lane, speed restrictions in force.
I-84: Rush hour traffic.
I-84: Rush hour traffic.
I-84 eastbound: Utility work, work on the shoulder, on the on ramp.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info