Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on I-90
I-90
Between Eastbound Huetter Rest Area (near Post Falls) and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for construction work. There is a width limit in effect. Until October 31, 2018 at about 11:59PM PDT.
Between Exit 15: Sherman Avenue (Coeur d'Alene) and Westbound Huetter Rest Area (near Post Falls). Look out for construction work. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until October 31, 2018 at about 11:59PM PDT.
Between Exit 17: Mullan Road and Exit 28: Crossroad (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until December 3, 2018 at about 11:45PM PDT.
Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PDT.
Between Exit 45: Silver Valley Road and Exit 40: Cataldo (near Pinehurst). Road construction work is in progress. The exit ramp is closed because the road is being repaved. Until Wednesday, at about 5:00PM PDT.