Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on I-84
I-84
Between The Oregon State Line and Exit 13: County Road (11 miles east of the Fruitland area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Until today at about 7:30PM MDT.
At Exit 9: US 30 (8 miles east of the Fruitland area). The entrance ramp is closed. The exit ramp is closed. A detour is in operation. Truck restrictions are in force. Until today at about 7:30PM MDT.
Between Exit 17: Sand Hollow and Exit 27: I-84B; Centennial Way (8 miles west of the Caldwell area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". Until July 6, 2018 at about 6:00PM MDT.
Today at 7:24 AM, Google reported a 7 minute delay eastbound. Between Exit 35: Northside Boulevard and Exit 36 (Nampa). Bridge maintenance work is in progress. People are working in the median. From 8:00AM MDT to 4:00PM MDT on Tuesday, Wednesday and Thursday. Until tomorrow at about 11:59PM MDT.
Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road maintenance work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on Saturday and from 10:00PM MDT to 9:00AM MDT on Sunday and from 10:00PM MDT to 5:00AM MDT on weekdays. Until July 1, 2018 at about 11:59PM MDT.
Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). There are alternating lane closures. Look out for loose gravel on the roadway. A seal coat treatment has been applied. Increase normal following distance. Observe speed limits. There is a width limit in effect. Width limit 16'0". From 7:00AM MDT to 5:00PM MDT on weekdays. Until June 30, 2018 at about 6:00PM MDT.
Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (5 miles east of the Hazelton area). Major road construction work is in progress. The road is being repaved. Speed restrictions are in force. Ramp restrictions are in force. There is a width limit in effect. The roadway is reduced to one lane. Speed limit 70 MPH. Width limit 14'0". Until November 2, 2018 at about 7:00PM MDT.
Between Exit 194: ID 25; Ridgeway Road (3 miles east of the Hazelton area) and Exit 201: ID 25; Kasota Road (6 miles west of the Burley area). There are alternating lane closures. Look out for loose gravel on the roadway. A seal coat treatment has been applied. Increase normal following distance. Observe speed limits. There is a width limit in effect. Width limit 14'0". Until Saturday, at about 5:00PM MDT.
Between Exit 216: ID 25; ID 77 and Exit 228 (11 miles east of the Heyburn area). Look out for construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". From 6:00AM MDT to 8:00PM MDT on weekdays and Saturday. Until November 20, 2019 at about 6:00PM MDT.