Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20
US 20 in both directions: Major road construction, long term road construction, on the off ramp.
Between Exit 322: US Route 20 Business and Ellis Road (near Rigby). Major road construction work is in progress. Look out for long term road construction work. On the off ramp. Until November 30, 2018 at about 7:00PM MDT.
US 20: Bridge construction.
Between The South Ashton City Limits and The Truck Scale Port of Entry (6 miles west of the Ashton area). Bridge construction work is in progress. Width limit 11'0". Speed limit 45 MPH. Until November 29, 2018 at about 5:30PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20
Map of Reports on US 20
US 20 in both directions: Major road construction, long term road construction, on the off ramp.
US 20: Bridge construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info