Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Reports on ID 55
ID 55
Between ID 78 and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 10 - minute delays. Width limit 14'0". Until September 18, 2020 at about 7:00PM MDT.
Between I-84 (Meridian) and US 20 (Boise). Look out for rush hour traffic.
Between First Street and Madison Street (Horseshoe Bend). Bridge construction work is in progress. There is work on the shoulder. Speed restrictions are in force. Speed limit 25 MPH. Until May 21, 2021 at about 7:00PM MDT.
Between Boise Street (Horseshoe Bend) and Paddy Flat Road; Scheline Lane (2 miles north of the Donnelly area). Watch for deer on the roadway. There is danger of a rock fall. Until Tuesday, at about 11:59PM MDT.
Between Shimmering Cover Lane (1 mile north of the Donnelly area) and US 95 (New Meadows). There is danger of a rock fall. Watch for deer on the roadway.