Reports on US 93
US 93
Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Look out for temporary traffic lights. Look out for flaggers. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 12'0". Expect 10 - minute delays. Until tomorrow at about 7:00PM MDT.
Between US 20 (Arco) and Hammond Lane (near Challis). Look out for large animals on the roadway.
Between Johnson Road and McKim Creek Road (19 miles north of the Challis area). There is danger of a rock fall. Drive with extreme caution.