Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on I-15
I-15
Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 40: Arimo Road (near Arimo). The road is being reconstructed. There is a width limit in effect. Speed limit 55 MPH. Until November 5, 2019 at about 11:59PM MDT.
Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until November 15, 2019 at about 5:00PM MDT.
Between Exit 89: US 91; Interstate 15 Business and Exit 98: Lambert Road (1 mile south of the Blackfoot area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 12'6". Until Friday, at about 6:00PM MDT.
Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until December 2, 2019 at about 11:59PM MDT.