Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 26
US 26: Road construction, roadway reduced to one lane, paving operations, width limit in effect, temporary traffic lights, traffic held, speed restrictions in force.
Today at 3:09 PM, Google reported a 3 minute delay eastbound. Between 1300 East Road and 1875 East Road (4 miles west of the Gooding area). Road construction work is in progress. The roadway is reduced to one lane. The road is being repaved. There is a width limit in effect. Look out for temporary traffic lights. Traffic is being held. Expect delays. Speed restrictions are in force. Width limit 11'0". Until Monday, at about 5:30PM MDT.
US 26 in both directions: Roadway reduced to one lane, road construction, bridge construction, paving operations, work on the shoulder, delays, speed restrictions in force, width limit in effect.
Between Havens Road and West Porterville Road; Parks Road (3 to 7 miles west of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. There is work on the shoulder. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 10'0". From 7:30AM MDT to 5:00PM MDT daily. Until June 30, 2018 at about 11:59PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 26
Map of Reports on US 26 Between 1300 East Road and 1875 East Road (4 miles west of the Gooding area). Road construction work is in progress. The roadway is reduced to one lane. The road is being repaved. There is a width limit in effect. Look out for temporary traffic lights. Traffic is being held. Expect delays. Speed restrictions are in force. Width limit 11'0". Until Monday, at about 5:30PM MDT. Between Havens Road and West Porterville Road; Parks Road (3 to 7 miles west of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. There is work on the shoulder. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 10'0". From 7:30AM MDT to 5:00PM MDT daily. Until June 30, 2018 at about 11:59PM MDT.
US 26: Road construction, roadway reduced to one lane, paving operations, width limit in effect, temporary traffic lights, traffic held, speed restrictions in force.
US 26 in both directions: Roadway reduced to one lane, road construction, bridge construction, paving operations, work on the shoulder, delays, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info