Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 40: Arimo Road (near Arimo). The road is being reconstructed. There is a width limit in effect. Speed limit 55 MPH. Until September 13, 2019 at about 11:59PM MDT.
Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Until October 31, 2019 at about 5:00PM MDT.
Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until November 1, 2019 at about 11:59PM MDT.
Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. A seal coat treatment has been applied. Speed limit 60 MPH. Width limit 18'0". Until September 13, 2019 at about 11:59PM MDT.
Between Exit 167: ID 22 (near Dubois) and Exit 180: Spenser Road (near Spencer). Major road construction work is in progress. The roadway is shared with opposing traffic. Speed limit 65 MPH. Width limit 18'0". Until July 31, 2019 at about 11:59PM MDT.