Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until March 3, 2021 at about 6:00AM MST.
Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until March 3, 2021 at about 6:00AM MST.
Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'.
(9 pm to 7 am)
Expect night time lane closures through the duration of the project.
Use caution when traveling through the work zone. Lane shifts occur throughout the project. Wide loads use caution as shoulder widths are limited throughout the project. Shoulder widths are reduced to two (2) feet in some areas.
Expect nightly lane closures on Northside Blvd in January and February. Flaggers may be present to direct traffic on Northside.
Southbound lane restrictions will be in place on Franklin Blvd. (Nampa) on Wednesday February 24, from 9:00 am to 4:00 pm. for paving the I-84 Eastbound Franklin Blvd. offramp at Exit 36.
Last updated yesterday at 6:30pm MST