Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Reports on US 93
US 93
Between 500 South Road and 400 South Road (3 miles north of the Twin Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until June 8, 2020 at about 7:00PM MDT.
Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). There is work on the shoulder. From 6:00AM MDT to 9:00PM MDT on weekdays. Until August 28, 2020 at about 9:00PM MDT.
Between US 20 (Arco) and Hammond Lane (near Challis). Look out for large animals on the roadway.
Between US 20 (Arco) and Hammond Lane (near Challis). Road maintenance work is in progress. Look out for mobile maintenance operations. Look out for trucks entering the roadway. Maintenance vehicles. Repairs are in progress. Look out for people on the roadway. Prepare to stop. Look out for flaggers. Short delays are possible. Until June 30, 2020 at about 5:30PM MDT.
Between 3700 North Road and 3600 North Road (1 mile south of the Lost River area). The road is rough. The pavement has buckled. Look out for potholes. Do not drive on the shoulder. Drive with extreme caution.
Between Johnson Road and McKim Creek Road (19 miles north of the Challis area). There is danger of a rock fall. Drive with extreme caution.
Between Pahsimeroi Valley Road and McKim Creek Road (14 to 15 miles north of the Challis area). Bridge maintenance work is in progress. Road maintenance work is in progress. A lane is closed. The right shoulder is closed. Observe the signs. Observe the signals. Prepare to stop. Look out for flaggers. Short delays are possible. Width limit 13'0". From 7:00AM MDT to 7:00PM MDT daily. Until Thursday, at about 7:00PM MDT.
Between S. Tower Creek Road and Gibbonsville Road (9 to 30 miles north of the Salmon area). Utility work is in progress. Until July 31, 2020 at about 6:00PM MDT.