Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on ID 55
ID 55
Between Marsing Bridge (near Marsing) and I-84 (near Nampa). Road construction work is in progress. The road is being repaved. A seal coat treatment has been applied. The roadway is reduced to one lane. Look out for loose gravel on the roadway. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. Speed limit 35 MPH. Expect 15 - minute delays. From 10:00PM MDT to 5:00AM MDT on weekdays. Until July 23, 2018 at about 5:00AM MDT.
Between I-84B; Nampa-Caldwell Boulevard and I-84 (near Nampa). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Until November 15, 2018 at about 6:00PM MDT.
Between Mather Road (McCall) and Woodland Road (3 miles south of the New Meadows area). Road construction. Paving operations. Roadway reduced to one lane. Delays. Look out for flaggers. Pilot car in operation. Speed restrictions in force. Width limit in effect. Speed limit 35 MPH. Expect 15 - minute delays. Width limit 12'0". Starting July 16, 2018 at 12:00AM MDT until September 14, 2018 at about 12:00PM MDT.