Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-90
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion.
Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT.
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion.
Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT.
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane.
Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT.
I-90 eastbound: Road construction, because the road is being repaved, roadway reduced to one lane, delays, detour in operation, speed restrictions in force, width limit in effect.
Between Exit 17: Mullan Road and Exit 28: Crossroad (3 to 8 miles east of the Coeur d'Alene area). Road construction work is in progress because the road is being repaved. The roadway is reduced to one lane. Expect delays. A detour is in operation. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Expect 15 - minute delays. Until today at about 7:00PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-90
Map of Reports on I-90 Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT. Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT. Between Exit 17: Mullan Road and Exit 28: Crossroad (3 to 8 miles east of the Coeur d'Alene area). Road construction work is in progress because the road is being repaved. The roadway is reduced to one lane. Expect delays. A detour is in operation. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Expect 15 - minute delays. Until today at about 7:00PM PDT.
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion.
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion.
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane.
I-90 eastbound: Road construction, because the road is being repaved, roadway reduced to one lane, delays, detour in operation, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning