Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 39
ID 39: Road construction, paving operations, single line traffic - alternating directions, look out for flaggers, width limit in effect, speed restrictions in force.
Between Sheeptrail Road and Army Way Road (7 to 12 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. Expect single line traffic alternating directions. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 35 MPH. Expect 10 - minute delays. Until July 22, 2019 at about 11:59PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 39
Map of Reports on ID 39 Between Sheeptrail Road and Army Way Road (7 to 12 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. Expect single line traffic alternating directions. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 35 MPH. Expect 10 - minute delays. Until July 22, 2019 at about 11:59PM MDT.
ID 39: Road construction, paving operations, single line traffic - alternating directions, look out for flaggers, width limit in effect, speed restrictions in force.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info