Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
ID 8
ID 8 in both directions: Road construction, paving operations, roadway reduced to one lane, delays, pilot car in operation, look out for flaggers, width limit in effect.
Between ID 3 and Oviatt Creek Road (5 miles east of the Bovill area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until Wednesday, at about 6:00PM PDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 8
Map of Reports on ID 8 Between ID 3 and Oviatt Creek Road (5 miles east of the Bovill area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until Wednesday, at about 6:00PM PDT. Between ID 3 and Oviatt Creek Road (5 miles east of the Bovill area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until Wednesday, at about 6:00PM PDT.
ID 8 in both directions: Road construction, paving operations, roadway reduced to one lane, delays, pilot car in operation, look out for flaggers, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning