ID 6: Loose gravel, road construction, road maintenance operations, consider using an alternate route.
Between Hatter Creek Road and O'Rielly Road (2 to 3 miles east of the Onaway area). Look out for loose gravel on the roadway. Road construction work is in progress. Road maintenance work is in progress. Consider using an alternate route.
ID 6 in both directions: Bridge construction, truck restrictions in force, width limit in effect, work on the shoulder, road construction, paving operations, roadway reduced to one lane, look out for flaggers, temporary traffic light.
Between Charlie Creek Road and John Creek Road (24 miles east of the Onaway area). Bridge construction work is in progress. Truck restrictions are in force. There is a width limit in effect. There is work on the shoulder. Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Look out for temporary traffic lights. Width limit 12'0".
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 6
Map of Reports on ID 6 Between Hatter Creek Road and O'Rielly Road (2 to 3 miles east of the Onaway area). Look out for loose gravel on the roadway. Road construction work is in progress. Road maintenance work is in progress. Consider using an alternate route.
ID 6: Loose gravel, road construction, road maintenance operations, consider using an alternate route.
ID 6 in both directions: Bridge construction, truck restrictions in force, width limit in effect, work on the shoulder, road construction, paving operations, roadway reduced to one lane, look out for flaggers, temporary traffic light.