Between I-84 and A Avenue (near Bliss). Bridge construction work is in progress. Look out for bridge damage. The roadway is reduced to one lane. Follow the signs. Look out for temporary traffic lights. There is a width limit in effect. Until May 31, 2019 at about 5:30PM MST.
Between I-84 and A Avenue (near Bliss). Bridge construction work is in progress. Look out for bridge damage. The roadway is reduced to one lane. Follow the signs. Look out for temporary traffic lights. There is a width limit in effect. Until May 31, 2019 at about 5:30PM MST.
Web Comment: Maximum width is 22 ft. In effect until further notice.
Last updated on February 13