Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
US 20
US 20: Rush hour traffic.
Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic.
US 20 in both directions: Road construction, alternating lane closures, work on the shoulder, consider using an alternate route, speed restrictions in force.
Between North Linder Road and North Meridian Road (near Eagle). Road construction work is in progress. There are alternating lane closures. There is work on the shoulder. Consider using an alternate route. Speed restrictions are in force. Speed limit 45 MPH. Until October 1, 2021 at about 6:00PM MDT.
US 20 eastbound: Road construction, work on the shoulder, roadway reduced to one lane, right lane closed, delay.
Between North Linder Road and North Locust Grove Road (near Eagle). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Expect delays. Speed limit 45 MPH. Expect 15 - minute delays. Until July 5, 2021 at about 11:59PM MDT.
US 20 eastbound: Road construction, right lane closed, drive carefully.
Between Cloverdale Road - Joplin Road and Joplin Road; Mountain View Drive (Boise). Road construction work is in progress. The right lane is closed. Drive carefully. From 7:00AM MDT to 7:00PM MDT daily. Until July 27, 2021 at about 7:00PM MDT.
US 20: Rush hour traffic.
Between Cloverdale Road - Joplin Road and Eighth Street (Boise). Look out for rush hour traffic.
US 20: Right turn bay closed, left turn bay closed.
At Veterans Memorial Parkway (Garden City). The right turn bay is closed. The left turn bay is closed. Until June 25, 2021 at about 11:59PM MDT.
US 20: Large animals on roadway.
Between US 93 (Arco) and Argon National Engineering Lab Road (28 miles west of the Idaho Falls area). Look out for large animals on the roadway.
US 20: Major road construction, width limit in effect, traffic congestion, long delays, consider using an alternate route.
Between I-15 and Exit 307: Lindsay Boulevard (Idaho Falls). Major road construction work is in progress. There is a width limit in effect. Look out for traffic congestion. Expect long delays. Consider using an alternate route. Width limit 11'0". Expect 10 - minute delays. Until Monday, at about 6:00AM MDT.
US 20: Construction work, shoulder closed.
Between Exit 320: US Route 20 Business and Exit 322: US Route 20 Business (near Rigby). Look out for construction work. The shoulder is closed. Until June 25, 2021 at about 7:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20
Map of Reports on US 20 Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic. Between North Linder Road and North Locust Grove Road (near Eagle). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Expect delays. Speed limit 45 MPH. Expect 15 - minute delays. Until July 5, 2021 at about 11:59PM MDT. Between Cloverdale Road - Joplin Road and Joplin Road; Mountain View Drive (Boise). Road construction work is in progress. The right lane is closed. Drive carefully. From 7:00AM MDT to 7:00PM MDT daily. Until July 27, 2021 at about 7:00PM MDT. Between Cloverdale Road - Joplin Road and Eighth Street (Boise). Look out for rush hour traffic. Between US 93 (Arco) and Argon National Engineering Lab Road (28 miles west of the Idaho Falls area). Look out for large animals on the roadway. Between Exit 320: US Route 20 Business and Exit 322: US Route 20 Business (near Rigby). Look out for construction work. The shoulder is closed. Until June 25, 2021 at about 7:00PM MDT.
US 20: Rush hour traffic.
US 20 in both directions: Road construction, alternating lane closures, work on the shoulder, consider using an alternate route, speed restrictions in force.
US 20 eastbound: Road construction, work on the shoulder, roadway reduced to one lane, right lane closed, delay.
US 20 eastbound: Road construction, right lane closed, drive carefully.
US 20: Rush hour traffic.
US 20: Right turn bay closed, left turn bay closed.
US 20: Large animals on roadway.
US 20: Major road construction, width limit in effect, traffic congestion, long delays, consider using an alternate route.
US 20: Construction work, shoulder closed.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning