Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
I-15
I-15 in both directions: Bridge maintenance operations, roadway reduced to one lane, reduce your speed, width limit in effect.
Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 31: Downey Road (9 miles south of the Arimo area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until July 12, 2021 at about 5:00PM MDT.
I-15 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, reduce your speed, width limit in effect.
Between Northbound Cherry Creek Rest Area and Exit 13: ID 38; State Highway 38 (near Malad City). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Width limit 16'0". Speed limit 65 MPH. Until July 27, 2021 at about 5:00PM MDT.
I-15 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, reduce your speed, width limit in effect.
Between Exit 17: ID 36; State Highway 36 and Malad Summit (6 to 7 miles north of the Malad City area). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Width limit 16'0". Speed limit 65 MPH. From 8:00AM MDT to 5:00PM MDT on weekdays. Until July 27, 2021 at about 5:00PM MDT.
I-15 in both directions: Lane closed, bridge maintenance operations, width limit in effect, reduce your speed.
Between Exit 22: Colton Lane and Southbound Malad Summit Rest Area (9 to 10 miles north of the Malad City area). A lane is closed. Bridge maintenance work is in progress. There is a width limit in effect. Reduce your speed. Width limit 14'0". Speed limit 65 MPH. Until Monday, at about 5:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15
Map of Reports on I-15 Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 31: Downey Road (9 miles south of the Arimo area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until July 12, 2021 at about 5:00PM MDT. Between Exit 22: Colton Lane and Southbound Malad Summit Rest Area (9 to 10 miles north of the Malad City area). A lane is closed. Bridge maintenance work is in progress. There is a width limit in effect. Reduce your speed. Width limit 14'0". Speed limit 65 MPH. Until Monday, at about 5:00PM MDT.
I-15 in both directions: Bridge maintenance operations, roadway reduced to one lane, reduce your speed, width limit in effect.
I-15 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, reduce your speed, width limit in effect.
I-15 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, reduce your speed, width limit in effect.
I-15 in both directions: Lane closed, bridge maintenance operations, width limit in effect, reduce your speed.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning