Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Reports on US 95
US 95
Between Hot Springs Road and The Little Salmon River Bridge (near New Meadows). Road construction work is in progress. The road is being repaved. Look out for bridge demolition work due to bridge construction work. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 14'0". Until November 8, 2021 at about 5:00PM MDT.
Between US Route 95 Business (5 miles north of the Craigmont area) and Winchester-Culdesac Road (7 miles south of the Culdesac area). There is work on the shoulder. The roadway is reduced to two lanes. Expect delays. Look out for flaggers. Expect 5 - minute delays. Until June 18, 2021 at about 5:30PM PDT.
Between US Route 95 Business and Winchester-Culdesac Road (5 to 7 miles south of the Culdesac area). Road construction work is in progress. The road is closed intermittently. There is work on the shoulder. Expect delays. Look out for flaggers. Expect 10 - minute delays. Until today at about 6:00PM PDT.
Between Ironwood Drive (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic.
Between ID 53 and Ohio Match Road (2 miles north of the Hayden area). The intersecting road is closed. Bridge construction work is in progress. Follow the detour signs. Until November 30, 2021 at about 5:00PM PDT.
Between 1st Street and Granite-Kelso Cut-Off Road (1 to 4 miles north of the Athol area). Road construction work is in progress due to road work. The right lane is closed. Speed limit 55 MPH. From 7:00AM PDT to 5:00PM PDT on weekdays. Until December 31, 2022 at about 5:00PM PDT.