Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
US 20
US 20: Rush hour traffic.
Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic.
US 20 in both directions: Road construction, alternating lane closures, work on the shoulder, consider using an alternate route, speed restrictions in force.
Between North Linder Road and North Meridian Road (near Eagle). Road construction work is in progress. There are alternating lane closures. There is work on the shoulder. Consider using an alternate route. Speed restrictions are in force. Speed limit 45 MPH. Until October 1, 2021 at about 6:00PM MDT.
US 20 eastbound: Road construction, work on the shoulder, roadway reduced to one lane, right lane closed, delay.
Between North Linder Road and North Locust Grove Road (near Eagle). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Expect delays. Speed limit 45 MPH. Expect 15 - minute delays. Until July 5, 2021 at about 11:59PM MDT.
US 20 eastbound: Road construction, right lane closed, drive carefully.
Between Cloverdale Road - Joplin Road and Joplin Road; Mountain View Drive (Boise). Road construction work is in progress. The right lane is closed. Drive carefully. From 7:00AM MDT to 7:00PM MDT daily. Until July 27, 2021 at about 7:00PM MDT.
US 20: Rush hour traffic.
Between Cloverdale Road - Joplin Road and Eighth Street (Boise). Look out for rush hour traffic.
US 20: Right turn bay closed, left turn bay closed.
At Veterans Memorial Parkway (Garden City). The right turn bay is closed. The left turn bay is closed. Until June 25, 2021 at about 11:59PM MDT.
US 20 in both directions: Road construction, lane closed, seal coat, entrance ramp closed, exit ramp closed.
Between Exit 52: Federal Way and I-84; I-84B Mountain Home (Boise). Road construction work is in progress. A lane is closed. A seal coat treatment has been applied. The entrance ramp is closed. The exit ramp is closed. Speed limit 25 MPH. Width limit 12'0". Until today at about 11:59PM MDT.
US 20 in both directions: Mobile maintenance operations, look out for flaggers, pilot car in operation, drive with extreme caution, prepare to stop.
Between US 93 (Arco) and New Sweden School Road (near Idaho Falls). Look out for mobile maintenance operations. Look out for flaggers. A pilot car is in operation. Drive with extreme caution. Prepare to stop.
US 20: Large animals on roadway.
Between US 93 (Arco) and Argon National Engineering Lab Road (28 miles west of the Idaho Falls area). Look out for large animals on the roadway.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20
Map of Reports on US 20 Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic. Between North Linder Road and North Locust Grove Road (near Eagle). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Expect delays. Speed limit 45 MPH. Expect 15 - minute delays. Until July 5, 2021 at about 11:59PM MDT. Between Cloverdale Road - Joplin Road and Joplin Road; Mountain View Drive (Boise). Road construction work is in progress. The right lane is closed. Drive carefully. From 7:00AM MDT to 7:00PM MDT daily. Until July 27, 2021 at about 7:00PM MDT. Between Cloverdale Road - Joplin Road and Eighth Street (Boise). Look out for rush hour traffic. Between US 93 (Arco) and New Sweden School Road (near Idaho Falls). Look out for mobile maintenance operations. Look out for flaggers. A pilot car is in operation. Drive with extreme caution. Prepare to stop. Between US 93 (Arco) and Argon National Engineering Lab Road (28 miles west of the Idaho Falls area). Look out for large animals on the roadway.
US 20: Rush hour traffic.
US 20 in both directions: Road construction, alternating lane closures, work on the shoulder, consider using an alternate route, speed restrictions in force.
US 20 eastbound: Road construction, work on the shoulder, roadway reduced to one lane, right lane closed, delay.
US 20 eastbound: Road construction, right lane closed, drive carefully.
US 20: Rush hour traffic.
US 20: Right turn bay closed, left turn bay closed.
US 20 in both directions: Road construction, lane closed, seal coat, entrance ramp closed, exit ramp closed.
US 20 in both directions: Mobile maintenance operations, look out for flaggers, pilot car in operation, drive with extreme caution, prepare to stop.
US 20: Large animals on roadway.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning