Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Reports on US 95
US 95
Between Hot Springs Road and The Little Salmon River Bridge (near New Meadows). Road construction work is in progress. The road is being repaved. Look out for bridge demolition work due to bridge construction work. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 14'0". Until November 8, 2021 at about 5:00PM MDT.
Between US 95B Craigmont (near Craigmont) and Frontage Road (near Culdesac). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. Expect 15 - minute delays. Until October 19, 2021 at about 5:30PM PDT.
Between US Route 95 Business (5 miles north of the Craigmont area) and Winchester-Culdesac Road (7 miles south of the Culdesac area). There is work on the shoulder. The roadway is reduced to two lanes. Expect delays. Look out for flaggers. Expect 5 - minute delays. Until June 18, 2021 at about 5:30PM PDT.
Between Ironwood Drive (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic.
At Lacey Avenue (Hayden). Utility work is in progress. There are local road closures in this area. Follow the local detour. For the next two weeks.
Between ID 53 and Ohio Match Road (2 miles north of the Hayden area). The intersecting road is closed. Bridge construction work is in progress. Follow the detour signs. Until November 30, 2021 at about 5:00PM PDT.
Between Exit 446: East Brunner Road; East Brunco Road and East Parks Road (2 miles south of the Athol area). Look out for traffic congestion. Expect delays.
Between 1st Street and Granite-Kelso Cut-Off Road (4 miles north of the Athol area). Road construction work is in progress due to road work. The right lane is closed. Speed limit 55 MPH. Width limit 16'0". From 6:00AM PDT to 4:30PM PDT on weekdays. Until December 31, 2022 at about 5:00PM PDT.
Between County Road 2C and Alderson Lane (near Bonners Ferry). A lane is closed intermittently. Clearance work is in progress. Look out for an obstruction on the roadway. Traffic is stop and go. Delays are clearing. Until June 1, 2021 at about 5:00PM PDT.