Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 12 in both directions: Road construction.
US 12 in both directions: Road construction.

Between State Highway 13 Business and Harris Ridge Road (1 mile east of the Kooskia area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. There is a height limit in effect. Height limit 17'0". Width limit 12'0". Until October 22, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 76.8 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays.

Last updated on September 17