Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 26 in both directions: Road construction, bridge maintenance operations, paving operations, seal coat, loose gravel, look out for flaggers, pilot car in operation, roadway reduced to one lane, delays, consider using an alternate route, width limit in effect.
US 26 in both directions: Road construction.

Between Old Highway 26 (6 miles west of the Carey area) and Griffin Loop (near Carey). Road construction work is in progress. Bridge maintenance work is in progress. The road is being repaved. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Look out for flaggers. A pilot car is in operation. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. There is a width limit in effect. Expect 15 - minute delays. Width limit 14'0". From 7:00AM MDT to 6:00PM MDT on weekdays. Until August 20, 2020 at about 6:00PM MDT.

Web Comment: Contractor: Western Construction 208-850-2812 Traffic Control: Road Work Ahead 208-734-4444 ITD contact: 208-886-7800

Last updated on August 3
US 26 in both directions: Road construction.
Map of US 26 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning